Your project in
safe hands.
Project process
Step by step
Step
to your destination.
A construction project goes through six key phases – from the initial concept, through design and approval, to the construction phase. At KRANZ engineering, we accompany you through every step: Architects and engineers work hand in hand, without interface losses. The result: transparent processes, clear responsibilities and a project that works – both technically and creatively.
Your advantages
The 6 phases
at a glance.
01 Concept
Before the first line is drawn on paper, we check the feasibility – technically, legally and economically. We develop solutions, evaluate locations and prepare cost estimates. The result: a sound basis for decision-making for your project.
02 Design
Architects and engineers work hand in hand: design meets construction. Fire protection, load-bearing structure, drainage – all specialist areas are already incorporated at this stage. This prevents costly subsequent corrections and ensures that your building is well thought out right from the start.
03 Authorization
We prepare all the necessary documents in a structured and official manner: Building application, structural analysis, BImSchG permits, expert reports. Our precise documentation ensures that approvals are granted quickly.
04 Implementation planning
Every screw, every cable is precisely defined – in workshop drawings, details and material plans. Architects and structural engineers work closely together. The result: collision-tested planning that works on the construction site – without any queries or improvisations.
05 Tendering & awarding
We obtain quotations, check service specifications and coordinate the awarding of contracts. We pay attention to quality, adherence to deadlines and the experience of the trades involved. The result: a strong construction team that implements your plans on time and on budget.
06 Construction phase
We are on site – as site managers and coordinators. We monitor the execution, clarify technical issues directly on the construction site and, as health and safety coordinators, ensure compliance with all regulations. Objective: We guarantee a smooth construction process from the first floor slab to acceptance.
Project phases
Our steps to success.
Filter
Career
Contact
us.
We examine the task, framework conditions, and next steps in a structured and targeted manner.